福利网址在线播放|日本中文一区在线|日本XXXX大陆国产精品精品久久|欧美人妻少妇麻豆|亚州午夜久久影院|性爱福利在线观看|av鲁丝一区二区久|色青五月tian99的热免费视频|青草草在线视频永久免费|亚洲AV解说专区在线观看

Precautions for installation of silent diesel generator set

Source: Time:2022-05-27 10:19:04 views:

The installation site shall be well ventilated, the generator end shall have sufficient air inlets, and the diesel engine end shall have good air outlets. The air outlet area shall be more than 1.5 times larger than the water tank area.

1. The installation site shall be well ventilated, the generator end shall have sufficient air inlets, and the diesel engine end shall have good air outlets. The air outlet area shall be more than 1.5 times larger than the water tank area.


2. The surroundings of the installation site shall be kept clean and articles that can produce corrosive gases and vapors such as acid and alkali shall not be placed nearby. Fire extinguishing devices shall be provided if possible.


3. For indoor use, the smoke exhaust pipe must be connected to the outside, the pipe diameter must be ≥ the diameter of the smoke exhaust pipe of the silencer, and the number of elbows connected to the pipe should not exceed 3 to ensure smooth smoke exhaust, and the pipe should be inclined downward by 5-10 degrees to avoid rainwater injection; If the exhaust pipe is installed vertically upward, a rain cover must be installed.


4. When the foundation is made of concrete, the levelness shall be measured with a level ruler during installation to fix the unit on a horizontal foundation. Special shockproof pads or anchor bolts shall be provided between the unit and the foundation.


5. The unit shell must have reliable protective grounding. For generators that need to be directly grounded at neutral point, the neutral grounding must be carried out by professionals and equipped with lightning protection devices. It is strictly prohibited to use the grounding devices of mains power for direct neutral point grounding.


6. The two-way switch between the generator and the mains must be very reliable to prevent reverse power transmission. The wiring reliability of the two-way switch shall be inspected and approved by the local power supply department.


Phone: 0086-13476414254(Wechat)
Fax: 0086-0710-3386304
Email: hbxrks@aliyun.com
Web: www. hbxrks.com
Add: No.C3-2, Jiahai Industrial Park, High-tech Zone,         Xiangyang, Hubei Province, China
0086-13476414254
Scan code to add friends on Wechat

Statement: some materials come from the Internet. If there is any infringement, please tell us to delete it!